Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Nice/Middleton Bridge Project - Resources

FAQ

Q: Why was the old bridge being replaced?

A: Completed in 1940, the old bridge suffered from traffic congestion and did not meet current safety standards. The old crossing would have required increasing maintenance and, due to the bridge’s single-lane capacity in each direction and lack of nearby alternative crossings, rehabilitation work would have caused severe traffic impacts.

Q: How does the new bridge compare with the old bridge?

A: The new bridge improves mobility, safety, and economic opportunities for Southern Maryland, Northeastern Virginia, and the region. Here are key comparisons:

  

NEW BRIDGE OLD BRIDGE
Four 12-foot-wide lanes Two 11-foot-wide lanes
Barrier-separated median        No Median
Two-foot-wide shoulders No shoulders
All tolls paid at highway speeds Cash tolls paid when stopped; some E-ZPass tolls paid at reduced-speed lanes
100-year service life Increasing maintenance needs and costs

Q: When did the new bridge open to the public?

A: The new bridge opened to the public on October 12, 2022

Q: What is happening to the old bridge?

A: Now that the new bridge is open, the old bridge is being demolished, and Some materials are being deposited in the Chesapeake Bay to aid in fish reef enhancements.

Q: How much does it cost to cross the new bridge?

A: The regular toll for passenger vehicles is currently $4.50. A commuter discount rate plan is available. For more information and to determine toll rates for other vehicles, please visit MDTA’s toll rate webpage.

Q: Do I need an E-ZPass to cross the new bridge?

A: The new bridge enables travelers to pay tolls at highway speeds by using an E-ZPass Maryland transponder or by Video Tolling. Drivers are strongly encouraged to acquire an E-ZPass due to significantly lower toll rates: Read more about E-ZPass, including how to get a transponder, here.

Project Study

Additional Information

 

Get Abobe Acrobat Reader
The meeting agendas and minutes are provided in Adobe PDF format. If you do not have a PDF viewer you can download a free version of Adobe Acrobat Reader at http://get.adobe.com/reader.

WAS THIS PAGE HELPFUL?

Public Calendar

Jul 28

Public Event 7 27

3:01 PM

Point Breeze

Plastic Free July

Plastic Free July is a global movement that encourages individuals and organizations to reduce their reliance on single-use plastics and adopt more sustainable habits. The initiative raises awareness about the environmental impacts of plastic waste and highlights practical ways to reduce consumption, protect natural resources, and support a cleaner future.

Potomac Waterway

At MDOT, Plastic Free July aligns with the department’s commitment to environmental stewardship and sustainability. Small changes in daily habits can collectively make a significant impact, helping to reduce waste and support ongoing steps to create a more sustainable transportation system and workplace.

Employees can support Plastic Free July by reducing their use of single-use plastics, choosing reusable alternatives, and properly recycling materials when possible. From bringing a reusable water bottle to using reusable shopping bags, every action contributes to a healthier environment and a more sustainable future.

Jul 31

PE723

12:00 PM

IT TEST

Public Event - Test



The Nissan was crunched (this is old...)

Aug 06

Capital Committee Meeting

9:00 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.