Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of October 1 – 7, 2023
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes.
TOLL DOLLARS AT WORK
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
9 AM
Livestream
Meeting Location Change: MDTA ETL Project Office, 8019 Corporate Drive, Suite F, Nottingham, MD 21236 - Large Conference Room
This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.
Meeting Location Change: MDTA ETL Project Office, 8019 Corporate Drive, Suite F, Nottingham, MD 21236 - Large Conference Room