Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Spring 2022 Bay Bridge Osprey Update

Submitted by Tamory Winfield on

With the ongoing work at the Bay Bridge that includes new replacement signing and lighting structures, the osprey nest platform was removed in early April for the safety of the workers and ospreys. It is important to note that the platform was removed in compliance with wildlife policies, as there were not eggs nor nestlings present, or even ospreys at the time of removal. At this time, there are plans to replace the osprey platform before the end of the year after the new signing and lighting structures have been erected.

In the interim, you may catch our feathered bridge commuters on our Bay Bridge traffic cameras from time to time.

https://mdta.maryland.gov/traffic-cameras-by-facility?WPL=#camera-999

 

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Dec 18

MDTA Board Meeting - December 18, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.

Jan 01

PE1057

1 PM

test

Test Event for version 10.5.7

Historic Car Event!!!

old car

Some Highlighted text with a yellow background. Some Highlighted text with a yellow background. Some Highlighted text with a yellow background. Some Highlighted text with a yellow background. Some Highlighted text with a yellow background. Some Highlighted text with a yellow background. Some Highlighted text with a yellow background. Some Highlighted text with a yellow background. Some Highlighted text with a yellow background.

Jan 25

PE20251125

1 PM

TEST

TEST TOWN HALL

ROB