Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

**UPDATED SCHEDULE** I-695/Broening Highway Interchange Reopens Monday, May 20

Submitted by Tamory Winfield on

**UPDATED SCHEDULE**

I-695/Broening Highway Interchange Reopens Monday, May 20

I-695 Turnaround Tolling Will Not Be in Effect at This Time

Access to Broening Highway is via existing turnaround from Inner Loop I-695, onto Outer Loop, to Broening Highway (Exit 44). Inner loop traffic destined for Broening Highway must use MD 151/North Point Boulevard (Exit 42) and follow detour to return to the Inner Loop. The last exit from the Inner Loop remains Exit 42. In addition, access to I-695 Outer Loop from Broening Highway will be open via existing turnaround. NO stopping at any time while using the I-695 turnaround. KEEP MOVING. I-695 Outer Loop will be one lane through the I-695 Sparrows Point Project work zone. Please stay alert and obey posted speed limits/traffic control devices. Learn more about the project here https://mdta.maryland.gov/I-695SparrowsPointProject/Home.

Note: Tolling operations at the I-695 turnaround are not in effect at this time. The Maryland Transportation Authority (MDTA) will reassess the status of I-695 turnaround tolling operations in late June. The MDTA will issue additional public notifications as those determinations are made.

Blog Category

Blog Calendar

Public Calendar

Nov 26

Test 11 25

3 PM

Point Breeze

Following unanimous approval from the Board of Public Works, the Maryland Transit Administration (MTA) will begin construction to expand and modernize the MARC train storage facilities at the Martin Maintenance Yard in Baltimore County. Expanding storage capacity at the rail yard is a key component to delivering more frequent service that better serve existing, changing and new travel markets as outlined in the MARC Growth and Transformation Plan.

Hello

The project scope includes increased storage capacity for MARC Trains at the Martin Maintenance Yard (located near Martin State Airport), new tracks with catenary electrification, crossover tracks, a new inspection pit, and equipment that includes water hydrants, air piping extensions and light fixtures to support train car maintenance. The $35 million investment in improvements and increased capacity for the Martin Maintenance Yard is set to begin later this fall, with completion slated for summer 2027. It is supported by a discretionary grant from the Federal Railroad Administration’s Consolidated Rail Infrastructure and Safety Improvements Program.

Nov 29

North Point Flea Plaza Market

7 PM

North Point Plaza
2401 North Point Blvd., Dundalk, MD  21222

The DriveEzMD Outreach Team will be at the North Point Flea Market with games, promotional items, and answers to your E-ZPass account questions!

7:00am – 3:00pm

Nov 30

North Point Flea Plaza Market

7 AM

North Point Plaza
2401 North Point Blvd., Dundalk, MD  21222

The DriveEzMD Outreach Team will be at the North Point Flea Market with games, promotional items, and answers to your E-ZPass account questions!

7:00am – 3:00pm