Skip to main content
MDTA Home
Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of September 18 – 24, 2022

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of September 18 – 24, 2022

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of September 11 – 17, 2022

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of September 11 – 17, 2022

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of September 6 – 10, 2022

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of September 6 – 10, 2022

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of August 28 – 31, 2022

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of August 28 – 31, 2022

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

TOLL DOLLARS AT WORK 

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of August 21 – 27, 2022

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of August 21 – 27, 2022

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

TOLL DOLLARS AT WORK 

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of August 14 – 20, 2022

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of August 14 – 20, 2022

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of August 7 – 13, 2022

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of August 7 – 13, 2022

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of July 31 – August 6, 2022

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of July 31 – August 6, 2022

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of July 24 – 30, 2022

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of July 24 – 30, 2022

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

TOLL DOLLARS AT WORK 

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of July 17 – 23, 2022

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of July 17 – 23, 2022

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes

TOLL DOLLARS AT WORK 

Subscribe to

Keywords

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Dec 19

MDTA Board Meeting - December 19, 2024

9 AM

Livestream
Meeting Location Change: MDTA ETL Project Office, 8019 Corporate Drive, Suite F, Nottingham, MD 21236 - Large Conference Room

This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.

Meeting Location Change: MDTA ETL Project Office, 8019 Corporate Drive, Suite F, Nottingham, MD 21236 - Large Conference Room

 
E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.

Stop Fraud - Follow link.

Follow link to report fraud and/or abuse of State resources.