FOR IMMEDIATE RELEASE
June 19, 2015
WORK TO RESULT IN OFF-PEAK TEMPORARY LANE CLOSURES ON EASTBOUND CAMPBELL BOULEVARD IN WHITE MARSH
WHAT: Weather permitting, one lane on eastbound Campbell Boulevard between Honeygo Boulevard and Franklin Square Drive in White Marsh will be temporarily closed. The entrance into the Nottingham Square shopping center closest to the I-95 overpass will be closed for left-turning vehicles during the periodic lane closures. A temporary pedestrian walkway is located along the work zone on westbound Campbell Boulevard.
WHEN: Closures will begin Monday, June 22, until late July. Lane closures will take place during the following off-peak work hours: Mondays through Thursdays, 9 a.m. to 3 p.m.; Fridays, 9 a.m. to noon; and every day, 8:30 p.m. to 6 a.m. the following morning. All dates and times are approximate and dependent on weather.
WHY: The work is part of the reconstruction of the I-95/MD 43 interchange for the Maryland Transportation Authority's (MDTA) I-95 Improvements with Express Toll Lanes (ETL) Project, and involves the reconstruction/widening of the existing I-95 bridge over Campbell Boulevard. Campbell Boulevard will be widened to five lanes -- two lanes in each direction and a new center left-turn lane into Nottingham Square -- for improved traffic flow. A new pedestrian sidewalk will also be constructed along eastbound Campbell Boulevard.
To view real-time traffic camera images on MDTA roadways, visit mdta.maryland.gov. Know Before You Go! For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA. Find us on Facebook at facebook.com/TheMDTA.
The MDTA thanks motorists for their patience.
###