Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the week of June 1 – 7, 2025

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the week of June 1 – 7, 2025

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables

TOLL DOLLARS AT WORK 

The eastbound span may be closed Sunday from midnight to 5 a.m. the following morning, Monday through Wednesday from 10 p.m. to 5 a.m. the following morning, Thursday from 11 p.m. to 5 a.m. the following morning and Saturday from 11 p.m. to 7 a.m. the following morning for preservation/maintenance work. The nighttime closures feature deck removal and replacement for the eastbound bridge deck replacement project. Temporary concrete connection slabs are utilized for this crucial work, allowing for travel lanes to reopen each morning and for a smoother driving transition across work areas. Learn more here. Two-way traffic will operate on the westbound span during the full eastbound span closures.

One lane of the eastbound span may be closed Monday through Wednesday from 9 a.m. to 2:30 p.m. and Thursday from 9 a.m. to 1 p.m. for preservation/maintenance work. Two-way traffic will operate on the westbound span.

Travel off-peak when crossing from shore to shore. The best times to cross the Bay Bridge on weekends include: 

  • Friday – eastbound before 9 a.m. & after 8 p.m. and westbound before 9 a.m. & after 7 p.m.

  • Saturday – eastbound before 7 a.m. & after 7 p.m. and westbound before 9 a.m. & after 7 p.m.

  • Sunday – eastbound before 10 a.m. & after 7 p.m. and westbound before 11 a.m. & after 10 p.m.


Tolling Reminder:  All-electronic tolling is statewide in Maryland. Standard Video Toll rates apply for any trips not paid with a valid E-ZPass or Pay-By-Plate account at toll facilities. Enroll in E-ZPass or Pay-By-Plate at DriveEzMD.com

1-877-BAYSPAN (1-877-229-7726) for 24/7 real-time Bay Bridge traffic conditions. For real-time updates on major incidents follow us on X at x.com/TheMDTA

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Jun 07

Join MDTA for its 2025 Public Service Project

9 AM

Rock Creek Park
Meadowside Nature Center
5100 Meadowside Lane
Rockville, MD 20855

Come join us for the 2025 MDTA Public Service Project at Kengla House across the street from Meadowside Nature Center at Rock Creek Regional Park! This hands-on event will give you the opportunity to make a positive impact on the community while enjoying the beauty of nature. Whether you're a seasoned volunteer or new to public service, there's a role for everyone!

Event Flyer

Saturday, June 7, 2055 (9 a.m. –– Noon) 
Rain or Shine

Volunteers will assist with:

  • Trail maintenance and improvements
  • Technical trail feature installation
  • Vegetation management
  • Pedestrian bridge entrance upgrades

SIGN UP NOW AT: BIT.LY/MDTAJUNE7

For questions about the event, please contact Jacquelyn DeAngelo at JDeAngelo@mdta.state.md.us.

 

 

 

Jun 12

Finance and Administration Committee Meeting - June 12, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Jun 26

MDTA Board Meeting - June 26, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.