Skip to main content
MDTA Home
Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of June 30 – July 2, 2024

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of June 30 – July 2, 2024

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables

TOLL DOLLARS AT WORK 

The eastbound span may be closed Sunday from midnight to 5 a.m. the following morning and Monday and Tuesday from 10 p.m. to 5 a.m. the following morning for preservation/maintenance work. The nighttime closures feature deck removal and replacement for the eastbound bridge deck replacement project. The MDTA has designed this project to help ensure minimal traffic impacts for residents and motorists by avoiding 24/7 lane closures. Temporary concrete connection slabs are utilized for this crucial work, allowing for travel lanes to reopen each morning and for a smoother driving transition across work areas. Learn more here. Two-way traffic will operate on the westbound span during the full eastbound span closures.

There are no scheduled lane closures between July 3 – 7.

The best times to cross the Bay Bridge during the 4th of July holiday period include:

 

Eastbound

Westbound

Wednesday, July 3

before 9 a.m. and after 10 p.m.

before 10 a.m. and after 7 p.m.

Thursday, July 4

before 6 a.m. and after 2 p.m.

before 10 am. and after 2 p.m.

Friday, July 5

before 9 a.m. and after 6 p.m.

before 10 a.m. and after 6 p.m.

Saturday, July 6

before 8 a.m. and after 6 p.m.

before 8 a.m. and after 9 p.m.

Sunday, July 7

before 10 a.m. and after 4 p.m.

before 9 a.m. and after 10 p.m.

Monday, July 8

before 12 p.m. and after 7 p.m.

before 6 a.m. and after 4 p.m.


Tolling Reminder:  All-electronic tolling is statewide in Maryland. Standard Video Toll rates apply for any trips not paid with a valid E-ZPass or Pay-By-Plate account at toll facilities. E-ZPass remains the most cost-effective way to travel toll roads in Maryland, saving drivers up to 77% versus the higher rates and additional paperwork that come with Video Tolls. Always properly mount your E-ZPass transponder and be sure your vehicles and billing information are up to date to receive the lowest toll rate for your account. Enroll in E-ZPass or Pay-By-Plate at DriveEzMD.com.

For 24/7 real time Bay Bridge updates call 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com. You may also follow us on Twitter at twitter.com/TheMDTA where major incidents are covered.

Keywords

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Dec 19

MDTA Board Meeting - December 19, 2024

9 AM

Livestream
Meeting Location Change: MDTA ETL Project Office, 8019 Corporate Drive, Suite F, Nottingham, MD 21236 - Large Conference Room

This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.

Meeting Location Change: MDTA ETL Project Office, 8019 Corporate Drive, Suite F, Nottingham, MD 21236 - Large Conference Room

 
E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.

Stop Fraud - Follow link.

Follow link to report fraud and/or abuse of State resources.