Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the week of November 23 – 25, 2025

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the week of November 23 – 25, 2025

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables

TOLL DOLLARS AT WORK 

The westbound span may be closed Sunday from 10 p.m. to 5 a.m. the following morning for preservation/maintenance work. Two-way traffic will operate on the eastbound span during the full westbound span closure.

The eastbound span may be closed Monday and Tuesday from 8 p.m. to 5 a.m. the following morning for preservation/maintenance work. The nighttime closures for the eastbound bridge deck replacement project. Learn more here. Two-way traffic will operate on the westbound span during the full eastbound span closures.

There are no scheduled lane closures between November 26 – 30.

Suggested Thanksgiving holiday period travel times are:

  • Tuesday, November 25 – before 1 p.m. and after 8 p.m.;
  • Wednesday, November 26 – before 9 a.m. and after 7 p.m.;
  • Thursday, November 27 – before 10 a.m. and after 3 p.m.;
  • Friday, November 28 – before 9 a.m. and after 6 p.m.;
  • Saturday, November 29 – before 10 a.m. and after 8 p.m.; and
  • Sunday, November 30 – before 11 a.m. and after 8 p.m.

Tolling Reminder:  All-electronic tolling is statewide in Maryland. Standard Video Toll rates apply for any trips not paid with a valid E-ZPass or Pay-By-Plate account at toll facilities. Enroll in E-ZPass or Pay-By-Plate at DriveEzMD.com

1-877-BAYSPAN (1-877-229-7726) for 24/7 real-time Bay Bridge traffic conditions. For real-time updates on major incidents follow us on X at x.com/TheMDTA

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Dec 02

Capital Committee Meeting - December 02, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Dec 04

Finance and Administration Committee Meeting - December 4, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the Finance and Administration Committee Meeting Homepage. The Finance and Administration Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.

Dec 18

MDTA Board Meeting - December 18, 2025

9 AM

Livestream

This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.