Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge Driver’s Alert

Submitted by Tamory Winfield on

Coming Soon:

These two pieces of sizeable construction equipment (below) will be appearing at the Bay Bridge over the next week or so. They will be located in a work zone behind barrier on the western shore just prior to the bridge spans. No lanes of traffic on the bridge will be impacted beyond the routine weekday, off-peak lane closures (9 a.m. to 2:30 p.m. dependent on weather and traffic volumes). Crews will begin work installing foundations for new overhead lane signal gantries for the eastbound bridge approach. This is part of the ongoing project that will feature the reconfiguration of travel lanes to match the existing roadway that is expected to be completed in the fall of 2022. MDTA reminds motorists to avoid distractions, follow posted speed limits, obey all signs and traffic control devices. It's crucial to your safety and the safety of workers.

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Apr 30

2026 Spring Baltimore Port Alliance Hiring & Career Expo

10:30 AM

7200 Sollers Point Rd, Baltimore, MD 21222

10:30 am – 1:30 pm

 

Job Seeker Registration Link