Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

NICE BRIDGE OFF-PEAK FLAGGING CONTINUES

Submitted by Tamory Winfield on

FOR IMMEDIATE RELEASE

July 6, 2017

 

                                  NICE BRIDGE OFF-PEAK FLAGGING CONTINUES

                                 Work related to ongoing structural repairs and steel work

 

WHAT: The Nice Bridge (US 301) across the Potomac River will continue to be reduced to one lane with flagging operations alternating northbound and southbound traffic during off-peak hours Monday through Thursday.

WHEN: Daytime flagging may occur Monday through Thursday from 9 a.m. to 3 p.m.

Overnight flagging operations are also permitted Monday through Thursday from 8 p.m. to 5 a.m. the following morning.

WHY: Toll Dollars At Work. Crews are performing work as part of the Maryland Transportation Authority's (MDTA) $5.4 million project to repair the substructure and superstructure of the Nice Bridge. The project began in spring 2017 and is expected to be complete in early 2019.

Drivers may observe equipment like bridge inspection trucks on the bridge as well as inspectors climbing and moving over the structure.

Trucks greater than 10-feet wide will not be permitted to cross the bridge during flagging operations. Every effort will be made to cross all vehicles exceeding 10-feet from 8 a.m. to 8:30 a.m. and from 3:30 p.m. to 4 p.m.

Drivers of vehicles exceeding the width restriction must call 301-259-4444 to obtain approval and schedule an escort. Calls must be made one hour prior to arrival at the bridge and will only be accepted between 8 a.m. and 4 p.m. Monday through Thursday. In addition, no overweight vehicles (80,000+ lbs) will be permitted to cross the bridge when there is construction on the bridge.

To view real-time traffic camera images on MDTA roadways, visit mdta.maryland.gov. For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA. Find us on Facebook at facebook.com/TheMDTA.

The MDTA thanks its customers for their patience and reminds them to Stay Alert So No One Gets Hurt!!

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Jul 28

Public Event 7 27

3:01 PM

Point Breeze

Plastic Free July

Plastic Free July is a global movement that encourages individuals and organizations to reduce their reliance on single-use plastics and adopt more sustainable habits. The initiative raises awareness about the environmental impacts of plastic waste and highlights practical ways to reduce consumption, protect natural resources, and support a cleaner future.

Potomac Waterway

At MDOT, Plastic Free July aligns with the department’s commitment to environmental stewardship and sustainability. Small changes in daily habits can collectively make a significant impact, helping to reduce waste and support ongoing steps to create a more sustainable transportation system and workplace.

Employees can support Plastic Free July by reducing their use of single-use plastics, choosing reusable alternatives, and properly recycling materials when possible. From bringing a reusable water bottle to using reusable shopping bags, every action contributes to a healthier environment and a more sustainable future.

Jul 31

PE723

12:00 PM

IT TEST

Public Event - Test



The Nissan was crunched (this is old...)

Aug 06

Capital Committee Meeting

9:00 AM

Livestream

This public meeting is livestreamed and archived on the Capital Committee Meeting Homepage. The Capital Committee Meeting homepage also provides access to the virtual meeting, schedule, agenda, materials and minutes.