Skip to main content
MDTA Home
Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

I-695/Broening Highway Interchange Reopens Wednesday, May 15

Submitted by Tamory Winfield on

**Updated May 14**

I-695/Broening Highway Interchange Reopens Thursday, May 16

TOLLED Access to Broening Highway and I-695 Outer Loop Via Turnaround Resumes June 1, 2024

Access to Broening Highway is via existing turnaround from Inner Loop I-695, onto Outer Loop, to Broening Highway (Exit 44). Inner loop traffic destined for Broening Highway must use MD 151/North Point Boulevard (Exit 42) and follow detour to return to the Inner Loop. The last exit from the Inner Loop remains Exit 42. In addition, access to I-695 Outer Loop from Broening Highway will be open via existing turnaround. I-695 Outer Loop will be one lane through the I-695 Sparrows Point Project work zone. Please stay alert and obey posted speed limits/traffic control devices. Learn more about the project here https://mdta.maryland.gov/I-695SparrowsPointProject/Home.

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Dec 19

MDTA Board Meeting - December 19, 2024

9 AM

Livestream
Meeting Location Change: MDTA ETL Project Office, 8019 Corporate Drive, Suite F, Nottingham, MD 21236 - Large Conference Room

This public meeting is livestreamed and archived on the MDTA Board Meeting Homepage. The MDTA Board Meeting homepage also provides access to the meeting schedule, materials, agenda and minutes.

Meeting Location Change: MDTA ETL Project Office, 8019 Corporate Drive, Suite F, Nottingham, MD 21236 - Large Conference Room

 
E-ZPass logo

E-ZPASS®

Save time with an E-ZPass.

Stop Fraud - Follow link.

Follow link to report fraud and/or abuse of State resources.