Skip to main content
Home

STAY INFORMED

Sign up for updates and alerts from the Maryland Transportation Authority.

 

Stay Informed

Sign up for updates and alerts from the Maryland Transportation Authority

Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the week of November 16 – 22, 2025

Submitted by Tamory Winfield on

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the week of November 16 – 22, 2025

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables

TOLL DOLLARS AT WORK 

The westbound span may be closed Sunday from 10 p.m. to 5 a.m. the following morning for preservation/maintenance work. Two-way traffic will operate on the eastbound span during the full westbound span closure.

The eastbound span may be closed Monday and Wednesday from 8 p.m. to 5 a.m. the following morning, Thursday from 9 p.m. to 5 a.m. the following morning, Friday from 10 p.m. to 7 a.m. the following morning and Saturday from 8 p.m. to 8 a.m. the following morning for preservation/maintenance work. The nighttime closures for the eastbound bridge deck replacement project. Learn more here. Two-way traffic will operate on the westbound span during the full eastbound span closures.

One lane of the eastbound span may be closed Monday through Thursday from 9 a.m. to 2:30 p.m. and Friday from 9 a.m. to 12 p.m. for preservation/maintenance work. Two-way traffic will operate on the westbound span.


Tolling Reminder:  All-electronic tolling is statewide in Maryland. Standard Video Toll rates apply for any trips not paid with a valid E-ZPass or Pay-By-Plate account at toll facilities. Enroll in E-ZPass or Pay-By-Plate at DriveEzMD.com

1-877-BAYSPAN (1-877-229-7726) for 24/7 real-time Bay Bridge traffic conditions. For real-time updates on major incidents follow us on X at x.com/TheMDTA

Blog Category

Blog Calendar

WAS THIS PAGE HELPFUL?

Public Calendar

Nov 26

Test 11 25

3 PM

Point Breeze

Following unanimous approval from the Board of Public Works, the Maryland Transit Administration (MTA) will begin construction to expand and modernize the MARC train storage facilities at the Martin Maintenance Yard in Baltimore County. Expanding storage capacity at the rail yard is a key component to delivering more frequent service that better serve existing, changing and new travel markets as outlined in the MARC Growth and Transformation Plan.

Hello

The project scope includes increased storage capacity for MARC Trains at the Martin Maintenance Yard (located near Martin State Airport), new tracks with catenary electrification, crossover tracks, a new inspection pit, and equipment that includes water hydrants, air piping extensions and light fixtures to support train car maintenance. The $35 million investment in improvements and increased capacity for the Martin Maintenance Yard is set to begin later this fall, with completion slated for summer 2027. It is supported by a discretionary grant from the Federal Railroad Administration’s Consolidated Rail Infrastructure and Safety Improvements Program.

Nov 29

North Point Flea Plaza Market

7 PM

North Point Plaza
2401 North Point Blvd., Dundalk, MD  21222

The DriveEzMD Outreach Team will be at the North Point Flea Market with games, promotional items, and answers to your E-ZPass account questions!

7:00am – 3:00pm

Nov 30

North Point Flea Plaza Market

7 AM

North Point Plaza
2401 North Point Blvd., Dundalk, MD  21222

The DriveEzMD Outreach Team will be at the North Point Flea Market with games, promotional items, and answers to your E-ZPass account questions!

7:00am – 3:00pm