Bay Bridge (US 50/301) Lane Closures and Traffic Patterns Scheduled for the Week of June 2 – 8, 2024
Bay Bridge (US 50/301)
Lane Closures and Traffic Patterns
Scheduled for the Week of June 2 – 8, 2024
All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Headlights are required at all times on the bridge. Lane closures are subject to change and closure times are dependent on traffic volumes and other work variables.